Northern growth corridor
Mickleham, Craigieburn, Kalkallo, Wollert and the northern estates — bulk earthworks, site cuts and civil works for volume builders and developers.
We mobilise across the metro growth corridors and regional VIC, with plant sized from tight-access inner-city basements to bulk corridor earthworks. If your site is in Victoria, ask us.
Mickleham, Craigieburn, Kalkallo, Wollert and the northern estates — bulk earthworks, site cuts and civil works for volume builders and developers.
Tight-access basement excavation with in-house shoring and piling across the inner suburbs and CBD, where retention and neighbour protection matter most.
Werribee, Tarneit, Melton and the western corridor — bulk excavation, drainage and car park works at estate scale.
Site cuts, detailed excavation, retaining and drainage across the south-eastern growth suburbs.
Bundoora (our base), Epping, Reservoir, Doncaster and surrounds — residential and commercial excavation and civil packages.
Geelong, Ballarat, Bendigo and regional VIC for larger civil and logistics packages — plant sized to travel to the job.
Working in a specific suburb? Tell us where the site is when you request a quote — we’ll confirm coverage and mobilisation. Dedicated suburb pages are added where we have real local projects to show, rather than thin duplicated pages.
Greater Melbourne and regional Victoria: the northern and western growth corridors, inner Melbourne and the CBD, the south-east, the northern and north-eastern suburbs, and regional centres such as Geelong, Ballarat and Bendigo for larger civil packages.
The office is at Level 2, 1 Janefield Drive, Bundoora VIC 3083. Plant is sized to travel to where the work is, from tight-access inner-city basements to bulk earthworks in the growth corridors.
Plant hire, wet or dry, runs across Melbourne metro. Delivery and collection are floated to your site and quoted with the machine. Wet hire starts from $125/h (indicative, ex GST) with a 6-hour minimum.
A detailed Bill of Quantities back, typically within 2 business days of full documentation. No obligation.