Excavation + retention, one contract
Basement digs with retention piling, shotcrete and bored piers under the same contract — the critical path stays with one contractor.
The excavation and the retention from one self-perform contractor — priced fast, delivered with certainty, backed by real compliance. The standout advantage on a basement.
Basement digs with retention piling, shotcrete and bored piers under the same contract — the critical path stays with one contractor.
Own crews and plant mean a program we can commit to and single-point accountability when ground conditions bite.
A line-by-line BOQ priced off the geotech, typically within 2 business days of full documentation — transparent enough to interrogate at feasibility.
Deep basement digs with self-performed shoring and piling — one accountable contractor.
Basement ExcavationSoldier-pile & shotcrete retention, capping beams and anchors for basements.
Shotcrete & ShoringFoundation and retention piling, bored piers and capping beams — in-house.
Bored Piers & PilingHigh-volume site excavation, cut-to-fill, cart-away and import — self-performed.
Bulk ExcavationEngineered structural retaining walls — concrete, sleeper and block.
Retaining WallsPits, pipework, OSD tanks, subsoils and council connections.
Stormwater & DrainageYes. YellowX delivers the basement dig with retention piling, shotcrete and bored piers under the same contract, so the critical path stays with one accountable contractor. Retention is built to a qualified engineer’s design and certification.
For the dig, as a guide (indicative, ex GST): bulk excavation with cart-away runs about $45–80 per m³, depending on material and tip distance. Breaking or ripping rock adds about $25–50 per m³ on bulk jobs, and small tight-access rock jobs run about $150–400 per m³. Retention is engineered per site and quoted on request.
The plans and the geotechnical report. A line-by-line BOQ priced off the geotech typically comes back within 2 business days of full documentation.
Send the plans and the geotech — a detailed BOQ back, typically within 2 business days of full documentation.