Bored Piers & Piling Melbourne
Bored piers and piling carry the loads that shallow footings can’t — for foundations, retaining systems and basement retention. Getting them plumb, to depth and into the right founding material is what protects the structure above.
YellowX self-performs piling with excavator-mounted augers and piling plant, alongside the excavation and shoring. For builders and developers that means the piling, the dig and the retention come from one contractor with one program — not three interfaces to coordinate.
What's included
- Bored/CFA piles and foundation piers
- Retention piling — soldier and contiguous piles
- Rock sockets and deep founding
- Reinforcement supply, cage placement and concrete
- Capping beams and pile caps
- Pile set-out, verticality and depth verification
Where it fits in your program
Runs with detailed excavation and shoring — the load path before structure.
Plant we use
Compliance
- Piles designed and certified by a qualified structural/geotechnical engineer
- Founding conditions verified against the geotech report
- Reinforcement and concrete to specification with inspection hold points
Bored Piers & Piling — FAQs
What’s the difference between bored piers and screw piles?
Bored piers are cast-in-place concrete piles formed by augering a hole, placing reinforcement and pouring concrete — strong, versatile and suited to most Melbourne ground and to large loads. Screw piles are steel piles wound into the ground, better for lighter loads and fast, low-vibration installs. We advise which suits your engineer’s design and site.
Can you pile in tight-access sites?
Yes — we size augers and rigs to the access, including low-headroom and confined sites, which is common on inner-Melbourne basements.
Do you do the piling and the excavation together?
Yes. Self-performing piling, excavation and shoring as one package removes the interfaces between separate subcontractors and keeps the program and risk with one accountable contractor.