Site Cuts & Site Preparation Melbourne

A site cut levels a sloping or uneven block to a building platform — cut on the high side, fill and compact on the low side, batter the edges, and hand a builder a clean, set-out pad ready for footings.

It’s bread-and-butter builder work where speed and a reliable per-lot price matter. YellowX turns site cuts around fast, with a per-lot BOQ typically within 2 business days and crews sized from single lots to full townhouse and estate sites.

What's included

  • Cut to design platform level with survey control
  • Engineered fill placement and compaction
  • Benching on sloping sites
  • Batter forming and edge stabilisation
  • Spoil removal and select fill import
  • Set-out coordination and pad handover

Where it fits in your program

The builder’s first trade — establishes the building platform before footings.

Plant we use

5–20t excavators Positrack/skid steers Rollers & compactors Tip trucks

Compliance

  • Fill placed and tested to the geotechnical specification (compaction/level testing)
  • Erosion & sediment control to council/EPA requirements
  • DBYD service location before cutting

Site Cuts — FAQs

What is a site cut?

A site cut is the excavation that turns a sloping or uneven block into a level building platform — cutting earth away on the high side and, where needed, placing compacted engineered fill on the low side so footings can be set out on a stable, level pad.

How much does a site cut cost in Melbourne?

It depends on the fall across the block, soil and rock conditions, how much spoil leaves site, and access. As a guide (indicative, ex GST), bulk excavation with cart-away runs about $45–80 per m³, and a 5.5 t excavator with operator is from $125/h with a 6-hour minimum. We measure the cut and fill off your plans and return an itemised per-lot BOQ, so volume builders get a consistent, comparable rate across a project.

Can you handle multi-lot and estate site cuts?

Yes — we scale crews and plant for single lots through to townhouse and estate developments, and can price per lot for volume builders.

Tendering?

Need site cuts priced?

A detailed Bill of Quantities back, typically within 2 business days of full documentation. No obligation.